About Us

A national leader in repairs, maintenance decarbonisation and building compliance.

An aerial view of a large, modern trading floor or call centre office after major refurbishment, featuring long rows of white desks with monitor arms and minimal equipment, ready for the final technology fit-out following UPS removal and electrical works.
Home | Case study | UPS Removal Project

UPS Removal Project

Sector

Retail & Commercial

Location

London

Service

Refurbishment

Axis successfully completed a UPS removal project at a financial institution in Canary Wharf. As part of our brief, we created 34 new trading desk positions at our client’s high-rise office. Our commercial team also removed their redundant uninterruptible power supply (UPS) system. We delivered this £1.7million contract to the highest standard.

Financial Institution

We delivered a £1.7million project for the removal of a UPS system across a 20-week duration

Project Details

Our scope of works began by making structural alterations within the space. We installed mechanical and electrical elements and moved on to providing the painting and decorative works. This allowed our team to supply essential fabric maintenance services.

After a larger UPS system was established elsewhere in the building, we were awarded the role of Principal Contractor to remove the original facility. Our team worked within the middle of the bank’s busy 24-hour trading floor where the original equipment had been situated. It was encased in concrete block walls (built to withstand a bomb blast).

Project Challenges

One of our main project challenges was to limit the effect on day-to-day business proceedings. Our commercial division condensed the schedule of works into a 20-week programme that operated on a 24-hour basis.

We also undertook any work that was thought to be disruptive between 9pm and 5am, when the office space was mostly passive. In addition to this, we fully enveloped the working area with mock decoration to give the site an external appearance of a permanent corridor and office walls.

On completion of the work, we removed the hoarding and relocated the 16 offices and 240 trading positions over the weekend. Because of this, employees could return to their ready-to-work station, in a different location, on Monday morning. There was no disruption to their working day.

Specifications

  • Office interiors
  • 16 offices and 240 trading positions
  • 24-hour working to suit business needs
  • Structural alterations
  • Mock decoration effects
  • Uninterruptible power supply system removal

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

023 8070 1111
info@axisclc.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in…

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Social Housing

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Damp and Mould Remediation

Riverside Damp and Mould Remediation Programme

Social Housing

Riverside Damp and Mould Remediation Programme

Damp and Mould Remediation

Rosehill Court – Full Refurbishment

Social Housing

Rosehill Court – Full Refurbishment

Refurbishment

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Heritage

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Refurbishment

Torus – St Helens

Social Housing

Torus – St Helens

Decarbonisation

VIVO Defence Services – Southwick

Defence

VIVO Defence Services – Southwick

Decarbonisation

Roof and Solar PV Replacement

Social Housing

Roof and Solar PV Replacement

Refurbishment

Retrofit CSSolar PV Installation
Amey – Weeton Barracks

Defence

Amey – Weeton Barracks

Decarbonisation

Full Refurbishment

Blue Light

Full Refurbishment

Refurbishment

Stonewater – Herald Court

Social Housing

Stonewater – Herald Court

Refurbishment

Roof Repairs and Maintenance Works for MHS

Social Housing

Roof Repairs and Maintenance Works for MHS

Planned Maintenance

Roofing CS
Solar Panels Eastlight Community Homes

Social Housing

Solar Panels Eastlight Community Homes

Decarbonisation

Retrofit CS
Planned Cyclical Maintenance

Social Housing

Planned Cyclical Maintenance

Planned Maintenance

Planned Maintenance CSRefurbishmentRepairs
Communal Repairs and Decoration Works

Social Housing

Communal Repairs and Decoration Works

Responsive Repairs

Planned Maintenance CSRefurbishmentRepairs
Re-modelling and refurbishment of office space

Heritage

Re-modelling and refurbishment of office space

Refurbishment

OfficeRefurbishment
Grade II residential building upgrade

Social Housing

Grade II residential building upgrade

Refurbishment

PaintingRefurbishmentRoofingWindows
Heritage Modernisation and Conversion

Heritage

Heritage Modernisation and Conversion

Refurbishment

RefurbishmentRepairs and Maintenance
Fire Safety in Tower Block

Social Housing

Fire Safety in Tower Block

Building Compliance

FRA CS
Fire Risk Assessment Programme

Social Housing

Fire Risk Assessment Programme

Building Compliance

FRA CS
Replacement Heating System – ASHPs

Social Housing

Replacement Heating System – ASHPs

Decarbonisation

Mechanical and Electrical CSRetrofit CS
Residential Air Source Heat Pump Installation

Social Housing

Residential Air Source Heat Pump Installation

Decarbonisation

Mechanical and Electrical CS
NHS Repairs and Refurbishment

Healthcare

NHS Repairs and Refurbishment

Refurbishment

FRA WorksKitchens and BathroomsMechanical and ElectricalNHSPlanned Maintenance NewsRepairs and MaintenanceWindow Works
Responsive Repairs Service for Onward Homes

Social Housing

Responsive Repairs Service for Onward Homes

Responsive Repairs

Responsive Repairs CS
Responsive Repairs Service for Walsall Housing Group (WHG)

Social Housing

Responsive Repairs Service for Walsall Housing Group (WHG)

Responsive Repairs

Responsive Repairs CS
Southern Housing Responsive Repairs Programme

Social Housing

Southern Housing Responsive Repairs Programme

Responsive Repairs

Responsive Repairs CS
Communal Boiler Replacement

Social Housing

Communal Boiler Replacement

Planned Maintenance

Mechanical and Electrical CSPlanned Maintenance CS
Window Renewal Project

Blue Light

Window Renewal Project

Planned Maintenance

Retrofit CSWindow Works
Planned External Works and Roof Repairs

Social Housing

Planned External Works and Roof Repairs

Planned Maintenance

Case studiesRainwater goodsRoofing CSWindow Works
Bathroom Replacements Programme

Social Housing

Bathroom Replacements Programme

Planned Maintenance

Painting and Decorating CSWindow Works
Multiple Concurrent Programmes Contract – Westminster City Council

Social Housing

Multiple Concurrent Programmes Contract – Westminster City Council

Planned Maintenance

Responsive Repairs CS
Building Fabric Maintenance

Retail & Commercial

Building Fabric Maintenance

Planned Maintenance

Commercial CSGrade ListedOfficePlanned Maintenance CS
Premier Inn – Wirral Met College

Education

Premier Inn – Wirral Met College

Refurbishment

Harrogate and District NHS Foundation Trust

Healthcare

Harrogate and District NHS Foundation Trust

Refurbishment

Midlands Partnership NHS Foundation Trust

Healthcare

Midlands Partnership NHS Foundation Trust

Fire Safety

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Defence

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Fire Safety

Premier Inn – Bank

Hotel & Leisure

Premier Inn – Bank

Refurbishment

Swan Housing (Now Sanctuary)

Social Housing

Swan Housing (Now Sanctuary)

Responsive Repairs

University Hospitals of Liverpool Group

Healthcare

University Hospitals of Liverpool Group

Fire Safety

Southampton City Council

Social Housing

Southampton City Council

Fire Safety

Westminster City Council

Social Housing

Westminster City Council

Decarbonisation

Historic Building Conservation Project

Heritage

Historic Building Conservation Project

Refurbishment

Grade ListedMasonry and BrickworkPainting and Decorating CSRefurbishmentWindow Works
Clarion Housing Association

Social Housing

Clarion Housing Association

Planned Maintenance

Housing 21 – Edward Arnold Court

Social Housing

Housing 21 – Edward Arnold Court

Planned Maintenance

Cardiff Community Housing Association (CCHA)

Social Housing

Cardiff Community Housing Association (CCHA)

Decarbonisation

Royal Borough of Kingston – ASHP

Social Housing

Royal Borough of Kingston – ASHP

Decarbonisation

Alnwick District Playhouse Trust

Retail & Commercial

Alnwick District Playhouse Trust

Refurbishment

Exeter City Council

Social Housing

Exeter City Council

Decarbonisation

Premier Inn – Hampstead

Hotel & Leisure

Premier Inn – Hampstead

Refurbishment

Waitrose

Retail & Commercial

Waitrose

Refurbishment

Accent

Social Housing

Accent

Planned Maintenance

Southampton Solent University

Education

Southampton Solent University

Refurbishment

Center Parcs

Hotel & Leisure

Center Parcs

Refurbishment

Housing 21

Social Housing

Housing 21

Planned Maintenance

Student Cribs

Education

Student Cribs

Refurbishment

Metropolitan Police – Hendon Training Centre

Blue Light

Metropolitan Police – Hendon Training Centre

Refurbishment

Worshipful Company of Painter-Stainers

Heritage

Worshipful Company of Painter-Stainers

Refurbishment

Hyde

Social Housing

Hyde

Building Compliance

National Trust

Hotel & Leisure

National Trust

Refurbishment

University of Nottingham

Education

University of Nottingham

Refurbishment

Lift Schools

Education

Lift Schools

Refurbishment

Waitrose – Sushi Bar

Retail & Commercial

Waitrose – Sushi Bar

Refurbishment

Rugby School Group

Education

Rugby School Group

Refurbishment

MHA

Healthcare

MHA

Planned Maintenance

Westminster City Council – Solar PV

Social Housing

Westminster City Council – Solar PV

Decarbonisation

Outcomes First Group

Education

Outcomes First Group

Refurbishment

Metropolitan Police – Romford

Blue Light

Metropolitan Police – Romford

Refurbishment

London Fire Brigade

Blue Light

London Fire Brigade

Building Compliance

National Grid

Utilities & Industrial

National Grid

Planned Maintenance

Riverside Housing – RAF Cosford

Defence

Riverside Housing – RAF Cosford

Refurbishment

Housing 21 – Carroll Gardens

Healthcare

Housing 21 – Carroll Gardens

Refurbishment

Hoar Cross Hall Spa Hotel

Hotel & Leisure

Hoar Cross Hall Spa Hotel

Refurbishment

Riverside Housing – RAF Cosford – Bathrooms

Defence

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Cheltenham Chase Hotel

Hotel & Leisure

Cheltenham Chase Hotel

Refurbishment

DEFRA

Retail & Commercial

DEFRA

Refurbishment

YMCA NORTH TYNESIDE

Retail & Commercial

YMCA NORTH TYNESIDE

Refurbishment

Derbion

Retail & Commercial

Derbion

Refurbishment

Our Services