LINAC Removal & Installation – St Bartholomew’s Hospital

Sector

Healthcare

Location

London

Service

Refurbishment

Concept completed enabling works to support the removal of an existing LINAC machine and the installation of a new unit within St Bartholomew’s Hospital. We installed temporary partitions to segregate the work area and protect adjacent clinical spaces. We protected existing flooring within the control room and removed floor finishes within the exam room to allow access for equipment works. 

We removed lighting fittings above the equipment for reuse and partially removed the suspended ceiling to allow the Varian unit to be removed and reinstalled. Concept isolated chilled water services and exposed floor trunking to enable alterations. We isolated and removed the existing mains panel as part of the preparatory works. We completed builders’ work, including floor chasing for equipment containment and alterations to partitions to suit the new mains panel. Concept installed a free issue optical imager and an IRM mounting post to the existing ceiling. 

What we did

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within a live hospital environment.

Specifications

  • Temporary partitions for site segregation
  • Protection and removal of floor finishes within control and exam rooms
  • Partial removal and reinstatement of suspended ceiling systems
  • Isolation and alteration of chilled water services
  • Floor chasing and partition alterations for equipment containment
  • Installation of optical imager and IRM mounting post
  • Pressure testing, flushing, and certification of mechanical systems
  • Electrical containment and power supplies for new LINAC equipment
  • Renewal of grid ceiling section measuring approximately 5m x 3m
  • Localised making good, minor decorations, and joinery relocation

Project Overview

Number of months

2

Contract Value

£

70

K

The primary challenge involved working within a live healthcare setting where access, safety, and continuity of adjacent services were critical. We managed segregation, protection, and sequencing to control risk and maintain hospital operations throughout the programme. 

Concept coordinated mechanical and electrical activities to align with equipment installation requirements. Mechanical works included local pressure testing, system flushing, and certification. Electrical works included containment for new PDB and ERB units, installation of a free issue Heatherose equipment panel, rewiring of warning lights, and new power supplies for equipment. We removed and reinstated relax and view panels to suit the revised layout and allowed for the removal and reinstatement of fire alarm systems under a provisional sum. 

Innovations, challenges, solutions

Maintained service continuity by sequencing the works and coordinating trades to reduce disruption within critical hospital spaces.

Have a project to discuss?

023 8070 1111
info@axisclc.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in…

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Social Housing

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Damp and Mould Remediation

Riverside Damp and Mould Remediation Programme

Social Housing

Riverside Damp and Mould Remediation Programme

Damp and Mould Remediation

Rosehill Court – Full Refurbishment

Social Housing

Rosehill Court – Full Refurbishment

Refurbishment

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Heritage

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Refurbishment

Torus – St Helens

Social Housing

Torus – St Helens

Decarbonisation

VIVO Defence Services – Southwick

Defence

VIVO Defence Services – Southwick

Decarbonisation

Roof and Solar PV Replacement

Social Housing

Roof and Solar PV Replacement

Refurbishment

Retrofit CSSolar PV Installation
Amey – Weeton Barracks

Defence

Amey – Weeton Barracks

Decarbonisation

Full Refurbishment

Blue Light

Full Refurbishment

Refurbishment

Stonewater – Herald Court

Social Housing

Stonewater – Herald Court

Refurbishment

Roof Repairs and Maintenance Works for MHS

Social Housing

Roof Repairs and Maintenance Works for MHS

Planned Maintenance

Roofing CS
Solar Panels Eastlight Community Homes

Social Housing

Solar Panels Eastlight Community Homes

Decarbonisation

Retrofit CS
Planned Cyclical Maintenance

Social Housing

Planned Cyclical Maintenance

Planned Maintenance

Planned Maintenance CSRefurbishmentRepairs
Communal Repairs and Decoration Works

Social Housing

Communal Repairs and Decoration Works

Responsive Repairs

Planned Maintenance CSRefurbishmentRepairs
Re-modelling and refurbishment of office space

Heritage

Re-modelling and refurbishment of office space

Refurbishment

OfficeRefurbishment
Grade II residential building upgrade

Social Housing

Grade II residential building upgrade

Refurbishment

PaintingRefurbishmentRoofingWindows
Heritage Modernisation and Conversion

Heritage

Heritage Modernisation and Conversion

Refurbishment

RefurbishmentRepairs and Maintenance
Fire Safety in Tower Block

Social Housing

Fire Safety in Tower Block

Building Compliance

FRA CS
Fire Risk Assessment Programme

Social Housing

Fire Risk Assessment Programme

Building Compliance

FRA CS
Replacement Heating System – ASHPs

Social Housing

Replacement Heating System – ASHPs

Decarbonisation

Mechanical and Electrical CSRetrofit CS
Residential Air Source Heat Pump Installation

Social Housing

Residential Air Source Heat Pump Installation

Decarbonisation

Mechanical and Electrical CS
NHS Repairs and Refurbishment

Healthcare

NHS Repairs and Refurbishment

Refurbishment

FRA WorksKitchens and BathroomsMechanical and ElectricalNHSPlanned Maintenance NewsRepairs and MaintenanceWindow Works
Responsive Repairs Service for Onward Homes

Social Housing

Responsive Repairs Service for Onward Homes

Responsive Repairs

Responsive Repairs CS
Responsive Repairs Service for Walsall Housing Group (WHG)

Social Housing

Responsive Repairs Service for Walsall Housing Group (WHG)

Responsive Repairs

Responsive Repairs CS
Southern Housing Responsive Repairs Programme

Social Housing

Southern Housing Responsive Repairs Programme

Responsive Repairs

Responsive Repairs CS
Communal Boiler Replacement

Social Housing

Communal Boiler Replacement

Planned Maintenance

Mechanical and Electrical CSPlanned Maintenance CS
Window Renewal Project

Blue Light

Window Renewal Project

Planned Maintenance

Retrofit CSWindow Works
Planned External Works and Roof Repairs

Social Housing

Planned External Works and Roof Repairs

Planned Maintenance

Case studiesRainwater goodsRoofing CSWindow Works
Bathroom Replacements Programme

Social Housing

Bathroom Replacements Programme

Planned Maintenance

Painting and Decorating CSWindow Works
Multiple Concurrent Programmes Contract – Westminster City Council

Social Housing

Multiple Concurrent Programmes Contract – Westminster City Council

Planned Maintenance

Responsive Repairs CS
Building Fabric Maintenance

Retail & Commercial

Building Fabric Maintenance

Planned Maintenance

Commercial CSGrade ListedOfficePlanned Maintenance CS
Premier Inn – Wirral Met College

Education

Premier Inn – Wirral Met College

Refurbishment

Harrogate and District NHS Foundation Trust

Healthcare

Harrogate and District NHS Foundation Trust

Refurbishment

Midlands Partnership NHS Foundation Trust

Healthcare

Midlands Partnership NHS Foundation Trust

Fire Safety

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Defence

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Fire Safety

Premier Inn – Bank

Hotel & Leisure

Premier Inn – Bank

Refurbishment

Swan Housing (Now Sanctuary)

Social Housing

Swan Housing (Now Sanctuary)

Responsive Repairs

University Hospitals of Liverpool Group

Healthcare

University Hospitals of Liverpool Group

Fire Safety

Southampton City Council

Social Housing

Southampton City Council

Fire Safety

Westminster City Council

Social Housing

Westminster City Council

Decarbonisation

Historic Building Conservation Project

Heritage

Historic Building Conservation Project

Refurbishment

Grade ListedMasonry and BrickworkPainting and Decorating CSRefurbishmentWindow Works
Clarion Housing Association

Social Housing

Clarion Housing Association

Planned Maintenance

Housing 21 – Edward Arnold Court

Social Housing

Housing 21 – Edward Arnold Court

Planned Maintenance

Cardiff Community Housing Association (CCHA)

Social Housing

Cardiff Community Housing Association (CCHA)

Decarbonisation

Royal Borough of Kingston – ASHP

Social Housing

Royal Borough of Kingston – ASHP

Decarbonisation

Alnwick District Playhouse Trust

Retail & Commercial

Alnwick District Playhouse Trust

Refurbishment

Exeter City Council

Social Housing

Exeter City Council

Decarbonisation

Premier Inn – Hampstead

Hotel & Leisure

Premier Inn – Hampstead

Refurbishment

Waitrose

Retail & Commercial

Waitrose

Refurbishment

Accent

Social Housing

Accent

Planned Maintenance

Southampton Solent University

Education

Southampton Solent University

Refurbishment

Center Parcs

Hotel & Leisure

Center Parcs

Refurbishment

Housing 21

Social Housing

Housing 21

Planned Maintenance

Student Cribs

Education

Student Cribs

Refurbishment

Metropolitan Police – Hendon Training Centre

Blue Light

Metropolitan Police – Hendon Training Centre

Refurbishment

Worshipful Company of Painter-Stainers

Heritage

Worshipful Company of Painter-Stainers

Refurbishment

Hyde

Social Housing

Hyde

Building Compliance

National Trust

Hotel & Leisure

National Trust

Refurbishment

University of Nottingham

Education

University of Nottingham

Refurbishment

Lift Schools

Education

Lift Schools

Refurbishment

Waitrose – Sushi Bar

Retail & Commercial

Waitrose – Sushi Bar

Refurbishment

Rugby School Group

Education

Rugby School Group

Refurbishment

MHA

Healthcare

MHA

Planned Maintenance

Westminster City Council – Solar PV

Social Housing

Westminster City Council – Solar PV

Decarbonisation

Outcomes First Group

Education

Outcomes First Group

Refurbishment

Metropolitan Police – Romford

Blue Light

Metropolitan Police – Romford

Refurbishment

London Fire Brigade

Blue Light

London Fire Brigade

Building Compliance

National Grid

Utilities & Industrial

National Grid

Planned Maintenance

Riverside Housing – RAF Cosford

Defence

Riverside Housing – RAF Cosford

Refurbishment

Housing 21 – Carroll Gardens

Healthcare

Housing 21 – Carroll Gardens

Refurbishment

Hoar Cross Hall Spa Hotel

Hotel & Leisure

Hoar Cross Hall Spa Hotel

Refurbishment

Riverside Housing – RAF Cosford – Bathrooms

Defence

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Cheltenham Chase Hotel

Hotel & Leisure

Cheltenham Chase Hotel

Refurbishment

DEFRA

Retail & Commercial

DEFRA

Refurbishment

YMCA NORTH TYNESIDE

Retail & Commercial

YMCA NORTH TYNESIDE

Refurbishment

Derbion

Retail & Commercial

Derbion

Refurbishment