About Us

A national leader in repairs, maintenance decarbonisation and building compliance.

An aerial view of a large residential estate in a city, showing multiple low-rise apartment blocks arranged in a square and U-shape. Many of the building rooftops have visible arrays of new solar PV panels installed as part of energy retrofit works.
Home | Case study | Flagship Retrofit Works

Flagship Retrofit Works

Sector

Social Housing

Location

London

Service

Decarbonisation

Our role was to manage the project from its inception, which included delivering the installation of photovoltaic panels, alongside associated works. Warwick Estate comprises of nine residential blocks located close to Little Venice, just a short walk from Paddington Station in the borough of Westminster.

Westminster Council

Axis was employed by Westminster City Council to deliver their flagship retrofit roofing project at Warwick Low-Rise Estate

Project Details

From start to finish, the project ran smoothly. We showcased our ability to deliver vital retrofit projects, helping our clients meet their sustainability targets. Westminster City Council is committed to becoming a carbon neutral Council by 2030, and as a city by 2040. This fits our own targets, as we look to achieve carbon neutrality by 2030 and becoming a net zero company by 2050.

Axis worked alongside our partners at Bauder who produced the BauderSolar technology implemented in these works. They also attended the site regularly for quality and performance inspections with our on-site team. The works within this project were grant funded, which means the residents at Warwick Estate have seen no cost for the installation. All stakeholders are delighted with the works, which were delivered on schedule. Axis Europe is proud to have been given the opportunity to work on this future-proofing retrofit programme, to deliver gold standard works that will continue to help our clients and residents for years to come.

To begin the programme of works, our team installed independent scaffolding towers over communal block entrances. We erected these at either the front or rear elevation depending on the location of the internal Electrical Intake Cupboard (EIC). These were required during the electrical preparatory works, for fixing the cable and trunking to the façade of the building. Our team ran an armoured cable from the roof level isolator, down the façade of the building entering through the brickwork to the EIC. The cables are contained within galvanised square ducting on the external façade of the blocks.

The Bauder PV systems are extremely quick to install. They provide a cost-effective and highly efficient solution for retrofit works. As soon as the panels arrived on-site, our team erected a goods only hoist in suitable locations for each block. We were able to transport all necessary materials to roof level as well as remove waste. Our installation team accessed each property’s roof via Haki staircases, constructed prior to the works. With the panels safely raised to roof level, we began the swift installation and connection process. The team placed each panel on its individual mount which then clicked into place.

Residents

Resident care is a key focus for Axis. We always maintain a close relationship to the communities in which we work by providing the best service for tenants, residents, and leaseholders. That’s why we’re a proud member of Tpas. As the properties on Warwick estate were all occupied during the programme of works, it was vital that Axis communicated effectively. The onsite team were careful not to disrupt residents throughout the process, but keeping them safe was always our top priority. Our team provided all of the relevant information that residents needed. This included the clear explanation of the schedule of works with timings for specific blocks, as well as describing the many benefits of retrofitting.

Sustainability of Retrofit Works

Sustainability is at the heart of projects like this, and Axis want to be part of the solution by facilitating and implementing carbon reduction plans on a large scale, that provide sources of renewable energy in a cost-effective manner.

Ultimately, the reduction in carbon emissions at Warwick Low-rise Estate is 55,000kg per annum. The PV array system will generate 290,000kWh per year, while an average household uses 2,900kWh per year. That means these panels can provide electricity for 100 households every year. Prior to the project Westminster City Council had PV panels installed on 57 blocks (9% of their entire stock) which was generating a total solar output of 446kWp. The system we installed at Warwick has significantly improved the overall output: The total output across all nine blocks in this scheme is circa 300kWp. This represents an increase of approximately 67% across the entire borough from this project alone.

For residents living at Warwick Estate, this is a massive reduction in their service charge bills. The energy produced by the PV panels will power communal lighting and communal power systems for years to come, providing a future-proofed solution for Westminster.

Find more of our housing projects, here.

Specifications

  • Scaffold and towers
  • Electrical Preparation
  • Goods Hoist
  • Haki Staircases
  • PV Panel Installation
  • Retrofit Delivery

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

023 8070 1111
info@axisclc.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in…

Notting Hill Genesis – Castletown Road, West Kensington

Social Housing

Notting Hill Genesis – Castletown Road, West Kensington

Refurbishment

Refurbishment
Lewisham Park Towers – Major Investment Programme

Blue Light

Lewisham Park Towers – Major Investment Programme

Decarbonisation

EWIMechanical and ElectricalRetrofit CSRoofing CSUPVC
Damp & Mould Remediation for Dudley Metropolitan Borough Council

Social Housing

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Damp and Mould Remediation

Riverside Damp and Mould Remediation Programme

Social Housing

Riverside Damp and Mould Remediation Programme

Damp and Mould Remediation

Rosehill Court – Full Refurbishment

Social Housing

Rosehill Court – Full Refurbishment

Refurbishment

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Heritage

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Refurbishment

Torus – St Helens

Social Housing

Torus – St Helens

Decarbonisation

VIVO Defence Services – Southwick

Defence

VIVO Defence Services – Southwick

Decarbonisation

Roof and Solar PV Replacement

Social Housing

Roof and Solar PV Replacement

Refurbishment

Retrofit CSSolar PV Installation
Amey – Weeton Barracks

Defence

Amey – Weeton Barracks

Decarbonisation

Full Refurbishment

Blue Light

Full Refurbishment

Refurbishment

Stonewater – Herald Court

Social Housing

Stonewater – Herald Court

Refurbishment

Roof Repairs and Maintenance Works for MHS

Social Housing

Roof Repairs and Maintenance Works for MHS

Planned Maintenance

Roofing CS
Solar Panels Eastlight Community Homes

Social Housing

Solar Panels Eastlight Community Homes

Decarbonisation

Retrofit CS
Planned Cyclical Maintenance

Social Housing

Planned Cyclical Maintenance

Planned Maintenance

Planned Maintenance CSRefurbishmentRepairs
Communal Repairs and Decoration Works

Social Housing

Communal Repairs and Decoration Works

Responsive Repairs

Planned Maintenance CSRefurbishmentRepairs
Re-modelling and refurbishment of office space

Heritage

Re-modelling and refurbishment of office space

Refurbishment

OfficeRefurbishment
Grade II residential building upgrade

Social Housing

Grade II residential building upgrade

Refurbishment

PaintingRefurbishmentRoofingWindows
Heritage Modernisation and Conversion

Heritage

Heritage Modernisation and Conversion

Refurbishment

RefurbishmentRepairs and Maintenance
Fire Safety in Tower Block

Social Housing

Fire Safety in Tower Block

Building Compliance

FRA CS
Fire Risk Assessment Programme

Social Housing

Fire Risk Assessment Programme

Building Compliance

FRA CS
Replacement Heating System – ASHPs

Social Housing

Replacement Heating System – ASHPs

Decarbonisation

Mechanical and Electrical CSRetrofit CS
Residential Air Source Heat Pump Installation

Social Housing

Residential Air Source Heat Pump Installation

Decarbonisation

Mechanical and Electrical CS
NHS Repairs and Refurbishment

Healthcare

NHS Repairs and Refurbishment

Refurbishment

FRA WorksKitchens and BathroomsMechanical and ElectricalNHSPlanned Maintenance NewsRepairs and MaintenanceWindow Works
Responsive Repairs Service for Onward Homes

Social Housing

Responsive Repairs Service for Onward Homes

Responsive Repairs

Responsive Repairs CS
Responsive Repairs Service for Walsall Housing Group (WHG)

Social Housing

Responsive Repairs Service for Walsall Housing Group (WHG)

Responsive Repairs

Responsive Repairs CS
Southern Housing Responsive Repairs Programme

Social Housing

Southern Housing Responsive Repairs Programme

Responsive Repairs

Responsive Repairs CS
Communal Boiler Replacement

Social Housing

Communal Boiler Replacement

Planned Maintenance

Mechanical and Electrical CSPlanned Maintenance CS
Window Renewal Project

Blue Light

Window Renewal Project

Planned Maintenance

Retrofit CSWindow Works
Planned External Works and Roof Repairs

Social Housing

Planned External Works and Roof Repairs

Planned Maintenance

Case studiesRainwater goodsRoofing CSWindow Works
Bathroom Replacements Programme

Social Housing

Bathroom Replacements Programme

Planned Maintenance

Painting and Decorating CSWindow Works
Multiple Concurrent Programmes Contract – Westminster City Council

Social Housing

Multiple Concurrent Programmes Contract – Westminster City Council

Planned Maintenance

Responsive Repairs CS
Building Fabric Maintenance

Retail & Commercial

Building Fabric Maintenance

Planned Maintenance

Commercial CSGrade ListedOfficePlanned Maintenance CS
Premier Inn – Wirral Met College

Education

Premier Inn – Wirral Met College

Refurbishment

Harrogate and District NHS Foundation Trust

Healthcare

Harrogate and District NHS Foundation Trust

Refurbishment

Midlands Partnership NHS Foundation Trust

Healthcare

Midlands Partnership NHS Foundation Trust

Fire Safety

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Defence

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Fire Safety

Premier Inn – Bank

Hotel & Leisure

Premier Inn – Bank

Refurbishment

Swan Housing (Now Sanctuary)

Social Housing

Swan Housing (Now Sanctuary)

Responsive Repairs

University Hospitals of Liverpool Group

Healthcare

University Hospitals of Liverpool Group

Fire Safety

Southampton City Council

Social Housing

Southampton City Council

Fire Safety

Westminster City Council

Social Housing

Westminster City Council

Decarbonisation

Historic Building Conservation Project

Heritage

Historic Building Conservation Project

Refurbishment

Grade ListedMasonry and BrickworkPainting and Decorating CSRefurbishmentWindow Works
Clarion Housing Association

Social Housing

Clarion Housing Association

Planned Maintenance

Housing 21 – Edward Arnold Court

Social Housing

Housing 21 – Edward Arnold Court

Planned Maintenance

Cardiff Community Housing Association (CCHA)

Social Housing

Cardiff Community Housing Association (CCHA)

Decarbonisation

Royal Borough of Kingston – ASHP

Social Housing

Royal Borough of Kingston – ASHP

Decarbonisation

Alnwick District Playhouse Trust

Retail & Commercial

Alnwick District Playhouse Trust

Refurbishment

Exeter City Council

Social Housing

Exeter City Council

Decarbonisation

Premier Inn – Hampstead

Hotel & Leisure

Premier Inn – Hampstead

Refurbishment

Waitrose

Retail & Commercial

Waitrose

Refurbishment

Accent

Social Housing

Accent

Planned Maintenance

Southampton Solent University

Education

Southampton Solent University

Refurbishment

Center Parcs

Hotel & Leisure

Center Parcs

Refurbishment

Housing 21

Social Housing

Housing 21

Planned Maintenance

Student Cribs

Education

Student Cribs

Refurbishment

Metropolitan Police – Hendon Training Centre

Blue Light

Metropolitan Police – Hendon Training Centre

Refurbishment

Worshipful Company of Painter-Stainers

Heritage

Worshipful Company of Painter-Stainers

Refurbishment

Hyde

Social Housing

Hyde

Building Compliance

National Trust

Hotel & Leisure

National Trust

Refurbishment

University of Nottingham

Education

University of Nottingham

Refurbishment

Lift Schools

Education

Lift Schools

Refurbishment

Waitrose – Sushi Bar

Retail & Commercial

Waitrose – Sushi Bar

Refurbishment

Rugby School Group

Education

Rugby School Group

Refurbishment

MHA

Healthcare

MHA

Planned Maintenance

Westminster City Council – Solar PV

Social Housing

Westminster City Council – Solar PV

Decarbonisation

Outcomes First Group

Education

Outcomes First Group

Refurbishment

Metropolitan Police – Romford

Blue Light

Metropolitan Police – Romford

Refurbishment

London Fire Brigade

Blue Light

London Fire Brigade

Building Compliance

National Grid

Utilities & Industrial

National Grid

Planned Maintenance

Riverside Housing – RAF Cosford

Defence

Riverside Housing – RAF Cosford

Refurbishment

Housing 21 – Carroll Gardens

Healthcare

Housing 21 – Carroll Gardens

Refurbishment

Hoar Cross Hall Spa Hotel

Hotel & Leisure

Hoar Cross Hall Spa Hotel

Refurbishment

Riverside Housing – RAF Cosford – Bathrooms

Defence

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Cheltenham Chase Hotel

Hotel & Leisure

Cheltenham Chase Hotel

Refurbishment

DEFRA

Retail & Commercial

DEFRA

Refurbishment

YMCA NORTH TYNESIDE

Retail & Commercial

YMCA NORTH TYNESIDE

Refurbishment

Derbion

Retail & Commercial

Derbion

Refurbishment

Our Services