Fieldway worked with Kier Group to provide temporary electrical supplies and lighting during the phased construction of a 71,000 sq ft C.R. Laurence facility.

The works progressed alongside numerous contractors from groundworks and steelwork through to completion. Fieldway installed temporary electrics and lighting within the steel framework, returned regularly during a 14-week phase to adapt supplies as required, then stripped out the temporary systems without disrupting the final stages of construction. The project was delivered on time and without additional cost to the client.

What we did

Fieldway delivered phased temporary electrical installations across a 71,000 sq ft construction site for Kier.

Specifications

  • Temporary electrics
  • Temporary lighting
  • Steel framework supplies
  • Site power
  • Phased installation
  • Equipment strip-out
  • Energy strip-out
  • Sustainability considerations

Development size (sq ft)

71000

Main installation phase

14

weeks

Key construction phases

3

Fieldway worked alongside multiple contractors throughout the construction programme, adapting temporary supplies and lighting as the development progressed.

Resident Care and Communication

Phased delivery helped maintain safe and efficient construction activity across the busy site.

Fieldway delivered the works in phases, attending site regularly to install new supplies and lighting as required before systematically removing equipment at the end of the project.

Challenges

The temporary electrical system had to evolve alongside multiple construction phases and contractors.

This was the 1st time I’ve paid a final account that was the same price as original quote.

Chris Hayes, Surveyor

Kier Construction Ltd

Have a project to discuss?

023 8070 1111
info@axisclc.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in…

Pendleton Together – High Rise Fire Safety Improvements

Social Housing

Pendleton Together – High Rise Fire Safety Improvements

Active Fire

Active FireFire Safety
Wigan Council –  Fire Safety and Electrical Upgrade

Social Housing

Wigan Council – Fire Safety and Electrical Upgrade

Active Fire

ElectricalFire Safety
NHS Property Services Passive Fire Safety Works

Healthcare

NHS Property Services Passive Fire Safety Works

Fire Safety

CompartmentationComplianceFire DamperFire DoorsFire SafetyHealthcareHealthcare EstatesHospitalNHSPassive Fire StoppingRemediationSurveys
St Mungo’s – Fire Door Remedials

Social Housing

St Mungo’s – Fire Door Remedials

Passive Fire

Fire DoorsFire SafetyPassive Fire
Weaver Vale Housing Trust – Fire Safety Systems

Social Housing

Weaver Vale Housing Trust – Fire Safety Systems

Active Fire

Active FireElectrical ComplianceSecurity & Access Control
Christian Action Housing Association – Passive Fire Remedials

Social Housing

Christian Action Housing Association – Passive Fire Remedials

Passive Fire

fire safety consultancyPassive FireSocial Housing
Derby Homes – Fire Safety Systems

Social Housing

Derby Homes – Fire Safety Systems

Active Fire

Active Firefire safety consultancySocial Housing
Great Places Housing Group – Fire Alarm Upgrade

Social Housing

Great Places Housing Group – Fire Alarm Upgrade

Active Fire

Active FireFire alarmsFire DoorsFire Safetyfire systems
Wakefield and District Housing – Fire Door Replacements

Social Housing

Wakefield and District Housing – Fire Door Replacements

Passive Fire

Passive Fire
BAM Construction – Site Set-Up and Building Fit-Out

Retail & Commercial

BAM Construction – Site Set-Up and Building Fit-Out

Fire Safety Consultancy

Active FireFire DoorsFire Safetyfire safety consultancyPassive FireRemediationSocial Housing
Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Heritage

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Passive Fire

Fire SafetyInsulationPassive Fire
Capital Shopping Centres – Fire Protection and Structural Encapsulation

Retail & Commercial

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Passive Fire

Active FireFire Safetyfire systems