About Us

A national leader in repairs, maintenance decarbonisation and building compliance.

The striking exterior of a modern yellow brick apartment building with bright turquoise windows and Juliet balconies, showcasing a high-quality external property services project.
Home | Case study | External Property Services

External Property Services

Sector

Social Housing

Location

South East

Service

Responsive Repairs

Axis Europe was employed by London and Quadrant (L&Q) to complete a programme of external property services in Rochester, Kent. The project involved work across various brick-built properties and terrace blocks housing 23 residents, these included Lock House and the Five Bells Estate (Kingfisher Court and Robin Court). The location of each property lies within one of South East England’s famous conservation areas.

London and Quadrant (L&Q)

These external property services, valued at £317,000, were part of a cyclical contract

Project Details

Axis Europe was employed by London and Quadrant (L&Q) to complete a programme of external property services in Rochester, Kent. The project involved work across various brick-built properties and terrace blocks housing 23 residents, these included Lock House and the Five Bells Estate (Kingfisher Court and Robin Court). The location of each property lies within one of South East England’s famous conservation areas.

We have been working in partnership with our trusted clients L&Q for nearly 10 years. These planned and cyclical works come after previous projects that we have delivered for the housing association, such as their recent cyclical decorations contract for 2020/2021. Our Housing Division took on a mixed scope of works that was dependent on each property.

We began the project at Lock House with asbestos removal and roof renewal. Next, the team renewed the facias, soffits on the properties – this work came alongside the restoration of the rainwater goods and guttering. Equally important was the provision of decorations to the building. Our team then replaced all of the windows in a sash style with PVCu sliders, this was necessary due to the conservation nature of the area. We finished work at Lock House with the renewal of doors.

For each of the other three properties identified in the project, we delivered a programme of window renewals. Our external property services work at the Five Bells location was also unique in its nature. This was due to the colour of the casement PVCu windows, which had to be retained. Again, this was because of the property lying within a conservation area.

We also carried out similar works to the remaining three properties in concerns to the soffits and facias which were restored. This came alongside our maintenance of rainwater goods, as well as door renewals and cyclical decorations. Our team utilised cherry pickers and scaffolding throughout the project. We used this machinery to ensure safe and high-quality workmanship could be attained to the taller parts of each building. Our Resident Liason Officer carried out satisfaction surveys and received overwhelmingly positive feedback. We had 100% resident satisfaction.

Project Challenges

During these external property services, our team faced a couple of challenges throughout the project, chiefly being caused by COVID-19. The pandemic brought delays to the completion of the work, however, there were also challenges faced due to adverse weather. We lost a week of time because of a cold snap that occurred in February.

We overcome these challenges by having regular upfront conversations with L&Q. This enabled all parties to be regularly updated and allowed us to achieve our joint goal of successfully completing the works by late February – a tribute to the perseverance of our team.

Take a look at more of our housing sector projects, here.

Project Feedback

Specifications

  • Asbestos removal
  • Roof renewal
  • Soffit and fascia renewal
  • Rainwater goods renewal
  • Door and window renewal
  • External decorations

Axis have carried out works to Lock House & Five Bells Estate to a very high standard whilst keeping our residents updated along the way with zero complaints received which backs up the good work by the Axis team on the ground.

Our residents now have warmer homes due to the UPVC double glazed windows installed whilst at the same time reducing the need for ongoing maintenance works to the properties over the coming years. The contract has also come in within the budget tolerance with only a 1% increase on the original £317k gross budget which shows the financial awareness of the project team.

Mark Cullern, Portfolio Manager

L&Q

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

023 8070 1111
info@axisclc.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in…

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Social Housing

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Damp and Mould Remediation

Riverside Damp and Mould Remediation Programme

Social Housing

Riverside Damp and Mould Remediation Programme

Damp and Mould Remediation

Rosehill Court – Full Refurbishment

Social Housing

Rosehill Court – Full Refurbishment

Refurbishment

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Heritage

The Honourable Society of Gray’s Inn, Gray’s Inn Square

Refurbishment

Torus – St Helens

Social Housing

Torus – St Helens

Decarbonisation

VIVO Defence Services – Southwick

Defence

VIVO Defence Services – Southwick

Decarbonisation

Roof and Solar PV Replacement

Social Housing

Roof and Solar PV Replacement

Refurbishment

Retrofit CSSolar PV Installation
Amey – Weeton Barracks

Defence

Amey – Weeton Barracks

Decarbonisation

Full Refurbishment

Blue Light

Full Refurbishment

Refurbishment

Stonewater – Herald Court

Social Housing

Stonewater – Herald Court

Refurbishment

Roof Repairs and Maintenance Works for MHS

Social Housing

Roof Repairs and Maintenance Works for MHS

Planned Maintenance

Roofing CS
Solar Panels Eastlight Community Homes

Social Housing

Solar Panels Eastlight Community Homes

Decarbonisation

Retrofit CS
Planned Cyclical Maintenance

Social Housing

Planned Cyclical Maintenance

Planned Maintenance

Planned Maintenance CSRefurbishmentRepairs
Communal Repairs and Decoration Works

Social Housing

Communal Repairs and Decoration Works

Responsive Repairs

Planned Maintenance CSRefurbishmentRepairs
Re-modelling and refurbishment of office space

Heritage

Re-modelling and refurbishment of office space

Refurbishment

OfficeRefurbishment
Grade II residential building upgrade

Social Housing

Grade II residential building upgrade

Refurbishment

PaintingRefurbishmentRoofingWindows
Heritage Modernisation and Conversion

Heritage

Heritage Modernisation and Conversion

Refurbishment

RefurbishmentRepairs and Maintenance
Fire Safety in Tower Block

Social Housing

Fire Safety in Tower Block

Building Compliance

FRA CS
Fire Risk Assessment Programme

Social Housing

Fire Risk Assessment Programme

Building Compliance

FRA CS
Replacement Heating System – ASHPs

Social Housing

Replacement Heating System – ASHPs

Decarbonisation

Mechanical and Electrical CSRetrofit CS
Residential Air Source Heat Pump Installation

Social Housing

Residential Air Source Heat Pump Installation

Decarbonisation

Mechanical and Electrical CS
NHS Repairs and Refurbishment

Healthcare

NHS Repairs and Refurbishment

Refurbishment

FRA WorksKitchens and BathroomsMechanical and ElectricalNHSPlanned Maintenance NewsRepairs and MaintenanceWindow Works
Responsive Repairs Service for Onward Homes

Social Housing

Responsive Repairs Service for Onward Homes

Responsive Repairs

Responsive Repairs CS
Responsive Repairs Service for Walsall Housing Group (WHG)

Social Housing

Responsive Repairs Service for Walsall Housing Group (WHG)

Responsive Repairs

Responsive Repairs CS
Southern Housing Responsive Repairs Programme

Social Housing

Southern Housing Responsive Repairs Programme

Responsive Repairs

Responsive Repairs CS
Communal Boiler Replacement

Social Housing

Communal Boiler Replacement

Planned Maintenance

Mechanical and Electrical CSPlanned Maintenance CS
Window Renewal Project

Blue Light

Window Renewal Project

Planned Maintenance

Retrofit CSWindow Works
Planned External Works and Roof Repairs

Social Housing

Planned External Works and Roof Repairs

Planned Maintenance

Case studiesRainwater goodsRoofing CSWindow Works
Bathroom Replacements Programme

Social Housing

Bathroom Replacements Programme

Planned Maintenance

Painting and Decorating CSWindow Works
Multiple Concurrent Programmes Contract – Westminster City Council

Social Housing

Multiple Concurrent Programmes Contract – Westminster City Council

Planned Maintenance

Responsive Repairs CS
Building Fabric Maintenance

Retail & Commercial

Building Fabric Maintenance

Planned Maintenance

Commercial CSGrade ListedOfficePlanned Maintenance CS
Premier Inn – Wirral Met College

Education

Premier Inn – Wirral Met College

Refurbishment

Harrogate and District NHS Foundation Trust

Healthcare

Harrogate and District NHS Foundation Trust

Refurbishment

Midlands Partnership NHS Foundation Trust

Healthcare

Midlands Partnership NHS Foundation Trust

Fire Safety

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Defence

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Fire Safety

Premier Inn – Bank

Hotel & Leisure

Premier Inn – Bank

Refurbishment

Swan Housing (Now Sanctuary)

Social Housing

Swan Housing (Now Sanctuary)

Responsive Repairs

University Hospitals of Liverpool Group

Healthcare

University Hospitals of Liverpool Group

Fire Safety

Southampton City Council

Social Housing

Southampton City Council

Fire Safety

Westminster City Council

Social Housing

Westminster City Council

Decarbonisation

Historic Building Conservation Project

Heritage

Historic Building Conservation Project

Refurbishment

Grade ListedMasonry and BrickworkPainting and Decorating CSRefurbishmentWindow Works
Clarion Housing Association

Social Housing

Clarion Housing Association

Planned Maintenance

Housing 21 – Edward Arnold Court

Social Housing

Housing 21 – Edward Arnold Court

Planned Maintenance

Cardiff Community Housing Association (CCHA)

Social Housing

Cardiff Community Housing Association (CCHA)

Decarbonisation

Royal Borough of Kingston – ASHP

Social Housing

Royal Borough of Kingston – ASHP

Decarbonisation

Alnwick District Playhouse Trust

Retail & Commercial

Alnwick District Playhouse Trust

Refurbishment

Exeter City Council

Social Housing

Exeter City Council

Decarbonisation

Premier Inn – Hampstead

Hotel & Leisure

Premier Inn – Hampstead

Refurbishment

Waitrose

Retail & Commercial

Waitrose

Refurbishment

Accent

Social Housing

Accent

Planned Maintenance

Southampton Solent University

Education

Southampton Solent University

Refurbishment

Center Parcs

Hotel & Leisure

Center Parcs

Refurbishment

Housing 21

Social Housing

Housing 21

Planned Maintenance

Student Cribs

Education

Student Cribs

Refurbishment

Metropolitan Police – Hendon Training Centre

Blue Light

Metropolitan Police – Hendon Training Centre

Refurbishment

Worshipful Company of Painter-Stainers

Heritage

Worshipful Company of Painter-Stainers

Refurbishment

Hyde

Social Housing

Hyde

Building Compliance

National Trust

Hotel & Leisure

National Trust

Refurbishment

University of Nottingham

Education

University of Nottingham

Refurbishment

Lift Schools

Education

Lift Schools

Refurbishment

Waitrose – Sushi Bar

Retail & Commercial

Waitrose – Sushi Bar

Refurbishment

Rugby School Group

Education

Rugby School Group

Refurbishment

MHA

Healthcare

MHA

Planned Maintenance

Westminster City Council – Solar PV

Social Housing

Westminster City Council – Solar PV

Decarbonisation

Outcomes First Group

Education

Outcomes First Group

Refurbishment

Metropolitan Police – Romford

Blue Light

Metropolitan Police – Romford

Refurbishment

London Fire Brigade

Blue Light

London Fire Brigade

Building Compliance

National Grid

Utilities & Industrial

National Grid

Planned Maintenance

Riverside Housing – RAF Cosford

Defence

Riverside Housing – RAF Cosford

Refurbishment

Housing 21 – Carroll Gardens

Healthcare

Housing 21 – Carroll Gardens

Refurbishment

Hoar Cross Hall Spa Hotel

Hotel & Leisure

Hoar Cross Hall Spa Hotel

Refurbishment

Riverside Housing – RAF Cosford – Bathrooms

Defence

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Cheltenham Chase Hotel

Hotel & Leisure

Cheltenham Chase Hotel

Refurbishment

DEFRA

Retail & Commercial

DEFRA

Refurbishment

YMCA NORTH TYNESIDE

Retail & Commercial

YMCA NORTH TYNESIDE

Refurbishment

Derbion

Retail & Commercial

Derbion

Refurbishment

Our Services